Preview
Creation Date
3-27-2023
Description
Construction of the Center for the Study of 19th Century American taken on March 27, 2023.
Keywords
McKee Library, Third Floor, Remodel
3-27-2023
Construction of the Center for the Study of 19th Century American taken on March 27, 2023.
McKee Library, Third Floor, Remodel